December 2005 and January 2006  
Here the customer wanted to remove all the mature balsam.  This are near the lake is low and wet during the summer.  This was the only time to get this project done.

Here the customer wanted to remove all the mature balsam. This are near the lake is low and wet during the summer. This was the only time to get this project done.


Powered by Gallery v1 RSS