<---Return To Main

 Merango project 2008  
We had both tracked machines on this project.  The sheer size and wieght of the wood was more than the TL 126 could handle.

We had both tracked machines on this project. The sheer size and wieght of the wood was more than the TL 126 could handle.


Powered by Gallery v1 RSS